17) Connect the main relay 8P connector to the main relay.
18) Connect the neutral switch 2P connector.
1
19) Connect the 14P connector and the 6P connector.
2
3
4
5
6
7
8
9
10
11
12
20) Tighten the 8 x 18 mm flange bolt securely while pushing
13
the starter cable (-) against the projection on the
crankcase.
14
Install the starter cable (+) and the main wire harness B
terminal on the starter solenoid, and tighten the 6 mm hex
15
nut to the specified torque.
TORQUE: 5.5 N . m (0.6 kgf . m, 4.1 lbf . ft)
16
Install the power tilt relay B terminal on the starter
17
solenoid, and tighten the 6 mm self-locking nut to the
specified torque [Power trim/tilt type only].
18
TORQUE: 5.5 N . m (0.6 kgf . m, 4.1 lbf . ft)
19
20
6-13
[2]
MAIN RELAY
8P CONNECTOR
[1]
MAIN RELAY
[6]
MAIN RELAY
BRACKET
[5]
14P CONNECTOR
[2]
MAIN WIRE
HARNESS B
TERMINAL
[1]
STARTER
SOLENOID
[7]
STARTER
CABLE (-)
8 x 18
834
[3]
NEUTRAL SWITCH
2P CONNECTOR
[4]
6P CONNECTOR
[4]
[3]
POWER TILT
6 mm HEX
RELAY B
NUT
TERMINAL
[6]
STARTER
[5]
CABLE (+)
6 mm SELF-
LOCKING NUT