002 Fusing: Ends
003 Pressure
[Forced Ready Setting]
1108
Japan use only
007 Time
1109
[Fusing Nip Band Check]
001
Execute
Pre-Idling Time
002
Specifies the fusing rotation time before executing SP1109-001.
Stop Time
003
Specifies the time for measuring the nip.
1112
[Environmental Correction: Fusing]
Temp.: Threshold: Low
001
Specifies the threshold temperature for low temperature condition.
Temp.: Threshold: High
002
Specifies the threshold temperature for high temperature condition.
003 Low Temp. Correction
The heating roller has two lamps. One heats the
center of the heating roller and the other heats both
ends of the heating roller.
-
[–10 to 250 / 0 / 1 deg/step]
The heating roller has two lamps. One heat s the
center of the heating roller and the other heats both
-
ends of the heating roller.
*ENG
[22 to 60 / 22 / 0.1 sec/step]
Executes the nip band measurement between
fusing belt and pressure roller.
-
If the nip band width is not 8 mm, and fusing is
not good, replace the pressure roller or install a
new fusing unit.
*ENG
[0 to 120 / 0 / 1 sec/step]
* ENG
[5 to 30 / 10 / 1 sec/step]
*ENG
[10 to 23 / 17 / 1 deg/step]
*ENG
[24 to 40 / 30 / 1 deg/step]
*ENG
[0 to 15 / 5 / 1 deg/step]
System Service Mode
8
149