1. In 2nd gear. check
for
proper
centering.
Change
adjustment on screw as
required.
2.
While arm is fitted against adjusting screw.
measure clearance
between change lever and
shaft drum dowel
pin.
3.
Repeat
steps
(2) and (3)
shifting
from 3rd to 2nd.
Clearance m
ust equal
(3) above.
Change
adjustment
using
screw
as
required.
4
.
Repeat step
(
1
).
E.
Kick starter
assembly (Refer t
o 3 -2 -H
.)
Set
the kick gear clip in t
he hole in
the
crankcase (R).
(Figs. 3-4
-
12
and 3 -4
-
13)
92
Fig. 3-4-11
Fig.
3
-4
-
12
I. Engager la 2eme,
et
verifier
le centrage correct.
Changer
l'ajustement
sur
la vis
comme
requis.
2. Tandis
que
le bras
est
ajuste contre la
vis
de reglage,
mesurer
le
jeu
entre le levier
selecteur
et le goujon de
tambour.
3. Repeter Jes operations
(2)
et (3) en degradant de la
3eme en
2eme
vitesse. Le
jeu doit
etre egal
a
(3)
ci-
dessus. Changer l'ajustement
en
utilisant la
vis
comme
requis.
4. Repeter !'operation (I).
E.
Assemblage
de
demarreur
a
pied (Se
referer
a
3-2-H.)
Caler le circlip
de
pignon de demarrage dans le
trou du
carter (R). (Figs.
3-4-12 et 3-4-
13)