Installing The Optional Dual Two-Stage Iv Pole - Stryker InTouch Critical Care Bed Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the optional dual two-stage IV pole

The optional dual two-stage IV pole is permanently attached to the head end of the product. It is equipped with a
telescopic pole that extends to provide a second height position. You can also fold and store the IV pole when not in use.
Tools required:
Two washers
Two bolts
3/8 in. drive ratchet
1/2 in. socket
To install the optional IV pole:
1.
Using a 3/8 in. drive ratchet and a 1/2 in. socket, install one washer (C) and one bolt (D) to secure the IV pole into
the socket at the head end of the product (A)
2.
Using a 3/8 in. drive ratchet and a 1/2 in. socket, install one washer (C) and one bolt (D) to secure the IV pole
support into the socket at the head end of the product (B)
Note: The bolts are coated in Scotch Grip. You must replace the bolt with an identical equivalent if the bolt is
removed during a service procedure.
A
C
D
www.stryker.com
Accessories
(Figure 1-121 on page
(Figure 1-121 on page
Figure 1-121: Dual two stage IV pole
2141-800-1 07 REV A
1-105).
1-105).
B
English
EN
1-105

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Fl2721312141

Table des Matières