EN 24
Establishing the electric con-
nection
NOTICE
Damaging of the machine through heavy
voltage fluctuations
Heavy voltage fluctuations can disrupt the control unit
and can cause system failures.
Plug the machine's power cable in a dedicated
current circuit or ensure that no devices are con-
nected that can cause heavy voltage fluctuation
when switched on.
If heavy voltage fluctuations cannot be avoided,
install a suitable device which protects the
machine from heavy voltage fluctuations.
NOTICE
Short-circuit hazard when the machine is
too cold
If the machine is transported from a cold environment
into a warmer environment, a short circuit may occur
caused by condensate.
Before
switching on the machine after trans-
portation, ensure the following:
The ambient air has the allowed temperature.
n
The machine has the same temperature as the
n
ambient air. This will take
The machine is completely dry.
n
The machine requires a continuous power supply for
proper operation.
1.
Plug the provided power cable into the power
connection at the connection panel of the
machine.
2.
If power failures occur regularly at the installation
location or if there are frequent voltage fluc-
tuations, install an online Uninterruptible Power
Supply (UPS).
If a power failure occurs during job execu-
tion, the tool may break and the blank
may be destroyed.
3.
Insert the plug of the cable into a socket that is
protected by a Residual Current Device / Ground
Fault Circuit Interrupter.
at least
48 hours.
Original Operating Instructions: R5
Version: 5/10/2019
R5 – Installing the machine
Integrating the machine into the
network
The following diagram visualizes how commands are
sent to the machine using our network technology:
F
. 18 – D
: H
IG
IAGRAM
OW COMMANDS ARE SENT OVER THE NETWORK
SX Virtual Link is similar to a device driver that transfers
data between DentalCNC and the machine. Upon
installation of the components, you start with config-
uring the machine.