en-US
Installation
•
Lever out the cover plate in the terminal room from the slot using suitable tools.
•
Insert the CIF module into the exposed slot with the pin contacts facing forward and permanently screw it
to the electronic module. (Screws: included in CIF module scope of delivery)
NOTICE
Explanations on commissioning as well as application, function, and configuration of the CIF
module on the pump are described in the installation and operating instructions for the CIF
modules.
NOTICE
For additional information, see section "Application and function of the CIF modules
[" 123]"
8
Commissioning
•
Electrical work: A qualified electrician must carry out the electrical work.
•
Installation/dismantling work: Specialist personnel must be trained to handle the necessary tools and re-
quired fixing materials.
•
Operation must be carried out by personnel who have been trained in how the full system operates.
DANGER
Danger of death due to lack of protective devices!
Due to missing protection devices of the electronic module, an electric shock can lead to
life-threatening injuries.
• Before commissioning, protection devices such as electronic module covers that were re-
moved must be reinstalled!
• An authorized technician must check the functionality of the safety devices on the pump
and motor prior to commissioning!
• Never connect the pump without the electronic module!
8.1
Filling and venting
Fill and vent the system correctly.
NOTICE
The pump has an automatic venting system. During commissioning, the automatic pump
venting function of the pump can be put into operation. This vents the pump hydraulics. All
further pump adjustments can be made in parallel.
46
Installation and operating instructions • Wilo-Stratos MAXO/-D/-Z • Ed.02/2023-10