Télécharger Imprimer la page

Yamaha YZ250 2004 Manuel D'atelier Du Proprietaire page 410

Publicité

FRONT BRAKE AND REAR BRAKE
EC5A5401
Rear master cylinder
1. Install:
9 Copper washer 1
9 Brake hose 2
9 Union bolt 3
w
Always use new copper washers.
cC
Install the brake hose so that its pipe por-
tion a a directs as shown and lightly touch-
es the projection b b on the master cylinder.
2. Install:
9 Master cylinder 1
9 Bolt (master cylinder) 2
3. Install:
9 Spring 1
9 Brake pedal 2
9 O-ring 3
9 Bolt (brake pedal) 4
9 Clip 5
NOTE:
Apply the lithium soap base grease on the
bolt, O-ring and brake pedal bracket.
5-21
CHAS
30 Nm (3.0 m•kg, 22 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
26 Nm (2.6 m•kg, 19 ft•lb)

Publicité

loading

Ce manuel est également adapté pour:

Yz250t 2004Yz250t1 2004