2 Installation
Bench Installation
Do not block the air intake and exhaust at the sides, or the exhaust at the rear of the
unit. Refer to the dimension diagram in the
Minimum clearances for bench operation are 2 inches (51 mm) along the sides and back. For easier
display viewing and binding post access, you can tilt the front of the unit up by rotating the extension
bar down.
Rack Installation
Use Rack Mount kit (Option 908 or Option 909 with handles) to rack mount the
instrument. Installation instructions are provided with the rack mount kit
Power analyzer mainframes can be mounted in a 19-inch EIA rack cabinet. They are designed to fit in
four rack-units (4U) of space.
Remove the feet before rack mounting the unit. Do not block the air intake and exhausts at the sides
and rear of the unit.
Redundant Ground for 400 Hz Operation
At 400 Hz AC input operation, the leakage current of the unit exceeds 3.5 mA. This requires the
installation of a permanent, redundant ground from the instrument chassis to earth ground. This
ensures that ground will always be connected and that any leakage current will be diverted to ground.
Refer to
BNC Connectors
Refer to the
Specifications
56
later in this section for installation instructions.
section for power factor statistics at 400 Hz operation.
Specifications
section.
Keysight N6705C User's Guide