Foot End Siderail Assembly Replacement - Stryker GoBed II MedSurg Bed Guide D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FOOT END SIDERAIL ASSEMBLY REPLACEMENT

Tools Required:
• 1/2" Socket
• 1/2" Combination Wrench
• 3/8" Drive Ratchet
• Bungee Cord (or equivalent)
D
B
C
B
Procedure:
1 .
Raise the bed to the highest position and apply the brakes . Raise the siderail to be repaired .
2 .
Raise the Gatch to the highest position and unplug the power cord from the wall receptacle .
3 .
If applicable, remove the plastic litter cover (optional) . Lift and fold the foot section back toward the head end of
the bed . Secure it using a bungee cord .
4 .
Using a 1/2" socket and a 1/2" combination wrench, remove the four locknuts and four bolts (A) holding the siderail
assembly to the support and remove the assembly . Support the siderail assembly while removing the last bolts .
5 .
Reverse the above steps to install the new siderail assembly .
6 .
Test the siderail for proper operation before returning the bed to service .
www.stryker.com
Service Information
G
A
E
A
Figure 2
280C-009-002 REV B
K
F
Return To Table of Contents
K
1-29

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gobed ii lit medsurgFl28c

Table des Matières