Cpr Activation Cable Replacement (Optional) - Stryker GoBed II MedSurg Bed Guide D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CPR ACTIVATION CABLE REPLACEMENT (OPTIONAL)

Tools Required:
• 7/16" Combination Wrench
Note
Unless otherwise indicated, refer to Figure 17,
Procedure:
1 .
Raise the bed to the highest position and apply the brakes .
2 .
Remove the head section plastic cover (if equipped) or raise the head section completely .
3 .
Remove the head board .
4 .
Unplug the power cord from the wall receptacle .
5 .
Using a 7/16" combination wrench, remove the nut, sleeve and bolt (D) holding both ends of the activation cable to
the fixed lever .
6 .
Using a 7/16" combination wrench, remove the nut, washer (E) holding the cable jacket to the mobile lever . Remove
the cable from the lever and keep the spring (F) . Use caution to avoid moving the other cable from its position .
7 .
Unscrew the two lock nuts (G) holding the jacket of the other end of the cable to the CPR handle . Remove the
wire from the handle . Once the new cable is installed, the free play of the CPR handle must not be more than 1/8" .
8 .
Reverse the above steps to install the new cable .
9 .
Test the CPR positioning before returning the bed to service .
Return To Table of Contents
1-60
Service Information
page
1-59, for this procedure .
280C-009-002 REV B
www.stryker.com

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gobed ii lit medsurgFl28c

Table des Matières