Foot Section Replacement - Stryker GoBed II MedSurg Bed Guide D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FOOT SECTION REPLACEMENT

Tools Required:
• 1/2" Combination Wrench
• #2 Phillips Screwdriver
• Bungee Cord (or equivalent)
H
D
Procedure:
1 .
Raise the bed to the highest position and apply the brakes . Flatten all sections of the mattress support .
2 .
Unplug the power cord from the wall receptacle .
3 .
Lower the siderails .
4 .
If applicable, remove the foot section plastic cover (optional) . Lift and fold back the foot section toward the head
end of the bed and secure it to the bed using a bungee cord (or equivalent) .
5 .
Remove the foot end mattress retainer (A) and the prop rod and install it on the new foot section . Replace the foot
section to horizontal position .
6 .
Using a 1/2" combination wrench, remove the two locknuts, two washers, two shoulder spacers, two bolts (B) linking
the foot section to the thigh section and remove the defective section .
7 .
Reverse the above steps to install the new foot section .
8 .
Test the bed for proper operation before returning it to service .
www.stryker.com
Service Information
G
Figure 6
280C-009-002 REV B
F
E
C
B
A
E
Return To Table of Contents
1-35

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gobed ii lit medsurgFl28c

Table des Matières