INSTALLATION
5.
Disconnect the 24 VDC power supply and reconnect the
wires that were installed in terminals 1, 2 and 3, in the
correct order.

FUSE F6

1.
If the system controller will switch the transfer switch from
utility to HSB generator and back, fuse F6 is functional.
2.
If not, disconnect the wires that are connected to
terminals 1, 2 and 3 on 12-position terminal block.
3.
With utility power on, verify the fact that all circuits
connected to the ATS are energized.
4.
Connect the negative lead of a 24 VDC power supply to
terminal 3.
5.
FOR NO MORE THAN 1 SECOND, press the positive lead
of the 24 VDC power supply to terminal 2.
6.
If the solenoid clicks and the mechanism transfers, fuse
F2 is functional.
7.
Disconnect the 24 VDC power supply and reconnect the
wires that were installed in terminals 1, 2 and 3, in the
correct order.

MANUAL TRANSFER SWITCH

!
A manual switch is NOT approved by
!
code when used with a stationary
or permanently installed HSB
generator. You MUST install an
ATS when used with a stationary
or permanently mounted HSB
generator by code.
All applicable codes must be
followed. The manufacturer of the
switch provides detailed instructions
that must be followed (Champion
manual part number 101271).
The Champion HSB requires the
installation of a Champion approved
ATS.