WARNING
Wear safety glasses while drilling the holes in the floor
3. Drill four (4) holes in the floor: 8 mm in diameter and at least 75 mm in depth at the
anchoring positions.
4. Place the tyre changer back into position.
5. Fix the anchoring screws in the floor through the holes in the tyre changer. Tighten the
anchoring screws at 20 N-m (15 ft-lbs).
1.5.4. Installing the GT inflation device (optional)
1. Open the left side panel of the tyre changer.
2. Fix the tank with adapter to the casing using the 4 hexagonal head M8 screws supplied
with the kit.
102
Manuale d'uso S 200