Télécharger Imprimer la page

Stryker Power-PRO IT Cot Mode D'emploi page 47

Civière

Publicité

Les langues disponibles

Les langues disponibles

A A m m b b u u l l a a n n c c e e l l o o c c a a t t i i o o n n
Secure the bracket to a horizontal structural support
surface or shelf using size #10, grade 5 screws
minimum (not supplied).
Make sure that the selected mounting surface is strong
enough to securely hold the S S M M R R T T charger and S S M M R R T T
Pak during transport.
Locate the bracket in an enclosed cabinet and out of
patient reach during transport.
Allow for easy S S M M R R T T Pak installation and removal.
Locate the power supply within reach of the power cord.
A A t t t t a a c c h h i i n n g g t t h h e e c c h h a a r r g g e e r r o o n n t t o o t t h h e e m m o o u u n n t t i i n n g g b b r r a a c c k k e e t t o o p p t t i i o o n n
To attach the S S M M R R T T charger onto the mounting bracket (Figure 29):
1. Align the rear keyway slots (A) onto the bracket fasteners (B).
2. Slide the S S M M R R T T charger (C) in until it locks into the mounting bracket (D) to secure the charger to the bracket.
6516-209-005 Rev AA.0
S S t t a a t t i i o o n n l l o o c c a a t t i i o o n n
Secure the bracket to a horizontal or vertical structural
support surface using size #10, grade 5 screws
minimum (not supplied).
For vertical installation, position the mounting bracket
so the spring tab is directly below the mounting screws,
so the S S M M R R T T Pak remains supported by the S S M M R R T T
charger even if the release button is accidently pressed.
Allow for easy S S M M R R T T Pak installation and removal.
Locate the power supply within reach of the power cord.
A
B
F F i i g g u u r r e e 2 2 8 8 – – M M o o u u n n t t i i n n g g b b r r a a c c k k e e t t
43
EN

Publicité

loading

Ce manuel est également adapté pour:

6516