17.2
Machine settings
17.2.1
Aligning / leveling the lathe
After installation and commissioning, it is recommended to check the alignment and levelling of
the machine before using it for the first time. In order to ensure working accuracy, the alignment
and levelling should be repeated at regular intervals.
17.2.2
Checking the fit of the jaw chuck
When mounting a chuck or face plate, first make sure that the cam-lock studs are
properly fixed. Otherwise, the chuck/face plate may never be removed again later
because the cam-lock studs have become twisted.
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
Fasten to the cross support with Allen screw, washers
and nut.
Mounting the tool post guard
Place the tool post guard on the bracket and fix it with
the Allen screw.
To level the machine, use a precision spirit level (according to DIN 877)
with an accuracy of 0.02 mm to 1000 mm. This allows the horizontal
position of the machine axis to be checked with sufficient accuracy in
both the longitudinal and transverse directions.
For anchored installation: Do not tighten the anchor bolt nuts carefully
and evenly until three to four days after the cement has cured.
Repeat the horizontal check a few days after initial start-up and every six
months thereafter.
NOTICE
Do not use cast iron chucks. Use ductile iron chucks only. Before
disassembling the jaw chuck, place a stable board or chuck cradle
under the spindle to protect the precision-ground surfaces.
NOTICE
ASSEMBLY
Connect the connecting
cables to the DRO.
Determine the correct axis
by turning the respective
handwheels and change
connections if necessary.
When all cables are in the
correct position, secure
plugs with the screws.
ED1000KDIG | ED1500KDIG
63