Then press the OK button on the
control panel.
Connect the power supply unit plug
to the mains, then press the OK
button.
When the perimeter wire is correctly
installed and the docking station is
connected to the mains power supply, the
red LED (1) illuminates.
Observe the "Docking station
controls" section, particularly if the
LED does not illuminate as
described. (
13.1)
112
Lift the robotic mower slightly by the carry
handle (1) and relieve the weight on the
drive wheels. Push the machine, resting
on its front wheels, into the docking
station.
No LED should illuminate on the docking
station after docking. (
13.1)
Then press the OK button on the
control panel.
9.9 Linking the robotic mower and
docking station
The robotic mower can only be
operated if it correctly receives the
wire signal emitted by the docking
station. (
11.16)
Checking the wire signal may take several
minutes. The red STOP button on top of
the machine terminates the link, the
previous installation assistant step is
called up.
Normal reception
Wire signal OK:
The text "Wire signal OK"
appears on the display. The
robotic mower and the docking
station are correctly linked.
0478 131 9933 A - EN