Télécharger Imprimer la page

Yamaha TT-R125W Manuel D'atelier Du Proprietaire page 418

Publicité

CRANKCASE, CRANKSHAFT AND BALANCER
3. Tighten:
Lead guide 1
G
Clutch cable holder 2
G
Bolt (crankcase) [45 mm (1.8 in)] 3
G
Bolt (crankcase) [55 mm (2.2 in)] 4
G
Bolt (crankcase) [30 mm (1.2 in)] 5
G
NOTE:
Apply
Quick
G
No.1215) on end of the crankcase bolts
[45 mm (1.8 in)] 3, as shown.
Tighten the crankcase bolts in stage, using a
G
crisscross pattern.
Quick gasket
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
4. Check:
Crankshaft and transmission operation
G
Unsmooth operation → Repair.
5. Install:
Timing chain 1
G
Intake timing chain guide 2
G
Bolt (intake timing chain guide)
G
LT
4 - 77
ENG
10 Nm (1.0 m · kg, 7.2 ft · lb)
10 Nm (1.0 m · kg, 7.2 ft · lb)
10 Nm (1.0 m · kg, 7.2 ft · lb)
®
gasket
(YAMAHA
®
:
10 Nm (1.0 m · kg, 7.2 ft · lb)
Bond

Publicité

loading