STEERING HEAD INSPECTION AND ADJUSTMENT
Install the upper bracket A, steering stem
G
nut B, cap C, handlebar D, upper han-
dlebar holder E, starter knob nut F and
number plate G.
NOTE:
The upper handlebar holder should be
G
installed with the punched mark a for-
ward.
Insert the end of fuel breather hose H into
G
the hole of the starter knob stay.
CAUTION:
First tighten the bolts on the front side of
the handlebar holder, and then tighten
the bolts on the rear side.
Pinch bolt (upper bracket):
25 Nm (2.5 m • kg, 18 ft • lb)
Steering stem nut:
110 Nm (11.0 m • kg, 80 ft • lb)
Handlebar upper holder:
23 Nm (2.3 m • kg, 17 ft • lb)
Starter knob nut:
1 Nm (0.1 m • kg, 0.7 ft • lb)
Number plate:
7 Nm (0.7 m • kg, 5.1 ft • lb)
TT-R125E/TT-R125LWE
Steering ring nut
G
Steering ring nut adjustment steps:
Remove the number plate and starter
G
knob.
Remove the main switch, handlebar and
G
upper bracket.
Remove the special washer 1.
G
Remove the upper ring nut 2, and rubber
G
washer 3.
Loosen the lower ring nut 4 using the
G
steering nut wrench 5.
Steering nut wrench:
YU-33975/90890-01403
3 - 30
INSP
ADJ