Télécharger Imprimer la page

Wacker Neuson RT82-SC3 Notice D'emploi page 39

Publicité

Les langues disponibles

Les langues disponibles

RT / RTx
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, such as fuel and engine oil.
6. Move the machine to its operating location.
wc_tx003863gb_FM10.fm
39
Operation

Publicité

loading