Use only pipelines and system components which are
• clean and dry inside (free from slag, swarf, rust and
phosphate coatings) and
• which are delivered with an air-tight seal.
Depending on the compressor versions, they are sup-
plied with blanking plates on the pipe connections or
shut-off valves. These must be removed before per-
forming the strength pressure and tightness tests and
commissioning the system.
I I n n f f o o r r m m a a t t i i o o n n
The blanking plates are only designed to serve
as a transport protection. They are not suitable
as a separation between different system sec-
tions during the strength pressure test.
Mount pipelines in such a way that the compressor is
protected from flooding with oil or liquid refrigerant dur-
ing standstill. Follow the notes given in SH-170.
C C l l e e a a n n i i n n g g f f i i l l t t e e r r s s a a n n d d f f i i l l t t e e r r d d r r i i e e r r s s
N N O O T T I I C C E E
!
!
For systems with rather long pipelines or for
brazing operations without protective gas:
Install the suction-side cleaning filter (mesh size
< 25 μm).
A suction-side cleaning filter must satisfy the following
criteria:
• Mesh size 25 µm
• Filter with perforated metal tubes around the inside
and outside diameter
• Appropriate for bi-directional operation
N N O O T T I I C C E E
!
!
Risk of compressor damage!
Generously sized filter dryers should be used to
ensure a high degree of dehydration and to
maintain the chemical stability of the circuit.
Make sure to choose a suitable quality (molecu-
lar sieves with specially adapted pore sizes).
A A d d d d i i t t i i o o n n a a l l c c o o n n n n e e c c t t i i o o n n s s f f o o r r e e v v a a c c u u a a t t i i o o n n
For an optimal evacuation capacity, it is recommended
to install generously-sized, lockable additional connec-
tions on the discharge and suction sides. Sections
locked by check valves must have separate connec-
tions.
10
10
O O b b s s e e r r v v e e t t h h e e f f o o l l l l o o w w i i n n g g f f o o r r a a l l l l c c o o n n n n e e c c t t i i o o n n s s r r e e t t r r o o f f i i t t t t e e d d o o n n
t t h h e e c c o o m m p p r r e e s s s s o o r r
N N O O T T I I C C E E
!
!
Risk of refrigerant loss!
Check the thread.
Carefully screw the adapter in and tighten it to
the prescribed tightening torque.
Test tightness before commissioning!
4 4 . . 3 3 . . 4 4
P P i i p p e e s s f f o o r r F F I I c c o o o o l l i i n n g g , , E E C C O O ( ( e e c c o o n n o o m m i i s s e e r r ) ) a a n n d d L L I I
( ( l l i i q q u u i i d d i i n n j j e e c c t t i i o o n n ) )
M M o o u u n n t t i i n n g g o o f f f f i i n n e e f f i i l l t t e e r r s s
These connections lead directly into compressor areas
with sensitive mechanics. Therefore a filter must be
mounted into each pipe if the system is not manufac-
tured in serial production.
F F i i x x i i n n g g t t h h e e p p i i p p e e s s s s u u f f f f i i c c i i e e n n t t l l y y
An incorrect installation may lead to a very strong vibra-
tion of the pipework.
N N O O T T I I C C E E
!
!
Risk of damages caused by vibrations!
Securely fasten each pipe.
Check the vibration behaviour during operation!
Fasten every pipe to the compressor by means of a re-
frigeration clamp. To do that, use the mounting holes
on the compressor, see connections on the following
pages:
14a: ECO line
14b: Liquid line for FI cooling (standard extent of deliv-
ery) and for optional LI connection
N N O O T T I I C C E E
!
!
Risk of refrigerant loss!
Check the thread.
Screw in the adapter carefully with the required
tightening torque.
Test tightness before commissioning!
If the respective connecting valve is mounted at a later
time or is removed when mounting the pipe:
N N O O T T I I C C E E
!
!
Risk of refrigerant loss!
Check the threads.
Screw in the adapter carefully with the required
tightening torque.
Test tightness before commissioning!
SB-160-3 RUS
SB-160-3