Télécharger Imprimer la page

Wilo -EMU TR 50-2 Serie Notice De Montage Et De Mise En Service page 304

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 426
en
6.4.1.2
Oil change: sealing, gear and pre-
chamber
304
Installation and electrical connection
1. Place the mixer horizontally on a firm surface.
WARNING! Risk of hands being crushed. Ensure that the mixer cannot fall over
or slip away!
CAUTION! Do not set the mixer down on the propeller! Use an appropriate plat-
form for the propeller diameter.
2. Grip the propeller slowly and carefully and rotate the propeller.
3
Fig. 3: Oil change
1
Pre-chamber filler hole
2
Gear chamber filler hole
3
Sealing chamber filler hole
4
Pre-chamber drain hole
5
Gear chamber drain hole
6
Sealing chamber drain hole
Mixer is not installed.
Mixer is not connected to the mains.
Wear protective equipment!
1. Position the mixer horizontally on a firm surface.
WARNING! Risk of hands being crushed. Make sure the mixer cannot fall over or
slip out of position!
CAUTION! Do not place the mixer on the propeller! Always place the mixer on a
platform.
2. Position a suitable tank to collect the operating fluid.
3. Unscrew the screw plug of the filler hole:
1 = pre-chamber
2 = gear chamber
3 = sealing chamber
4. Unscrew the drain hole screw plug and drain operating fluid:
4 = pre-chamber
5 = gear chamber
6 = sealing chamber
5. Check the operating fluid: Notify customer service if the operating fluid contains
metal swarf!
6. Dispose of operating fluid in accordance with local regulations!
7. Clean the drain hole screw plug, replace the seal ring and screw it back in. Max.
tightening torque: 8 Nm (5.9 ft·lb)!
8. Pour the operating fluid through the filler hole.
⇒ Comply with the specifications for the operating fluid type and quantity!
9. Clean the filler hole screw plug, replace the seal ring and screw it back in. Max.
tightening torque: 8 Nm (5.9 ft·lb)!
2
1
6
5
4
WILO SE 2019-01

Publicité

loading