Télécharger Imprimer la page

Manitowoc S3000 Mode D'emploi page 26

Publicité

Les langues disponibles

Les langues disponibles

Installation

Notice
After opening suction, discharge and
receiver
service
pressure will not be detected until the
ice machine starts a freeze cycle and the
solenoid valves energize.
Step 4 Open Valves for the Lineset and
Receiver
You will not hear refrigerant flow when the
valves are opened. Refrigerant will not flow
until the ice machine is started and the
solenoid valve opens.
• All valve caps must be reinstalled,
tightened and leak‑checked to assure no
refrigerant leakage exists.
• Counterclockwise opens all valves (3).
Open the shutoff valves for the suction
(2) and liquid lines (1).
26
valves,
refrigerant
Step 5 Leak-Check the Refrigeration
System
A. Connect power to the ice machine
head section ‑ Do not connect
power to the CVD condensing unit.
B. Place the ICE/OFF/CLEAN toggle
switch in the ICE position for
60 seconds to equalize pressures.
C. Disconnect power to the ice
machine head section.
D. Leak‑check line set connections,
S‑trap and all factory joints in head
section and condensing unit.
E. Connect power to the CVD
condensing unit and allow system
to pump down.
Part Number 000017556 Rev 00 9/22
Section 2

Publicité

loading