Scu Administration - Mennekes ACU Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 74

4.4.1 SCU Administration

For the ACU to communicate with SCUs, they require
pairing with the ACU. For this process, an automatic search
function is integrated.
The SCUs of charging points found are pre-configured to
32 A.
For systems without the "auto switch", only cables of
32 A cables are acceptable due to the specified fuse
value.
Fig. 4: SCU Administration
Parameters
Description
ID
Automatically assigned address of the SCU
(non-editable) in the bus network of the
ACU.
Name
Unique name of the SCU.
Status
Status of the SCU:
 Power on / boot / Bus Scan: Restart
including time synchronization
 Install: Parameters must be checked
and adjusted
 Idle: Ready for charging
 User authentification: Authorization to
start charging process is running
 Charge permission: Waiting for
permission to charge
 Check User Cable: Check that a
charging cable is plugged in
 Charge in progress: Charging process
is running:
 Billing: Billing is carried out
 SCU disabled: Out of service
 Download FW Update: Firmware is
being downloaded
 Flash FW: Firmware update is running
 SCU reserved: Charging point reserved
10
10
Parameters
Description
Status
 User stop authentification:
Authorization to stop charging process
is performed
 Charge stop permission: Waiting for
permission to terminate charging
process
 Time expired: Charging time expired
(only in conjunction with control panel)
 Charge terminated: Charging process
is finished and charging cable is still
plugged in
 Error: Fault, see chapter "Fault code"
on page 32
 Info NA: System not ready for
operation yet
 COM-Error: The connection between
SCU and ACU is faulty
Error
Error type category A / B
 See chapter "Fault code" on page 32.
Min- / Max.
Minimum and maximum charging current
Curr.
for the charging point determined by SCU.
LB-Curr.
Maximum charging current allocated by
load balancing.
LB-Forecast
Charging current for charging points not
busy as forecasted by load balancing.
Meter-count
Current meter reading.
Setting up
Link to setup screen of respective SCU.
Software
Updating the SCU firmware.
update
Requirements:
 A connection to the upgrade server
exists.
 The upgrade server has a new
software version available.
In the case of a backend connection,
the SCU is updated by the backend.
If the SCU is not connected to the
Internet or the update server, the
update can only be done offline.
In this case, please contact MENNEKES
support.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Scu

Table des Matières