Turn Bladder Assembly Replacement - Stryker Isolibrium 2971 Manuel D'utilisation Et D'entretien

Surface de soutien intégré avec intouch fl27 2131 / 2141 version 4.0
Masquer les pouces Voir aussi pour Isolibrium 2971:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Turn bladder assembly replacement

Tools required:
Zipper pull tool or equivalent
Diagonal pliers
Procedure:
1.
Remove the top cover. See
2.
Separate the six Velcro® connectors holding the foot section gel crib to the pod assembly.
3.
Remove the foot section gel crib (F)
4.
Lift up on the bottom corner of the pods assembly and foam crib and disconnect the turn bladder quick disconnect.
Repeat for the opposite side.
5.
Remove the turn bladder red and black sensor hoses from the foot box. Push in on the sensor hose quick connector
and then pull outward on the hose.
Note: Do not kink or bend the hoses.
6.
Remove the hoses from the purse clips.
7.
Lift up on the foam crib, reach between the foam crib and the bottom cover to unhook the six Velcro® retainers (A)
and unsnap the 12 snap retainers (B)
www.stryker.com
Service
Cover replacement, top on page 1-34
(Figure 1-32 on page
Figure 1-32: Gel crib
(Figure 1-33 on page
2971-109-0 01 REV B
for removal.
1-61). Save the gel crib.
1-62). Repeat for the opposite side.
E E N N
1-61

Publicité

Chapitres

Table des Matières
loading

Table des Matières