OPERATION CHECK AFTER INSTALLATION
• Check whether the control cable is adjusted
properly and there is no twist or bend in the cable.
• Check the control lever for smooth operation and
check the control cable for smooth movement
without restriction.
1) Set the control lever in the "F" (Forward) position
(approx. 30°) and check whether the shift shaft is
in the forward position.
2) Set the control lever in the "F" (Forward) full open
position and check whether the throttle lever is in
the full open position.
3) Return the control lever to the "N" (Neutral)
position and check whether the throttle lever is in
the full close position.
4) If the throttle lever does not move to the full open
and/or full close position, adjust the throttle
control cable again.
• If the carburetor throttle rod and throttle control
cable had been adjusted properly, the throttle
lever should automatically move to the full
open/full close position accordingly by setting
the control lever in the fully open/full close
position. If the throttle lever is not in the proper
position, adjust as follows.
-1. Remove the two 5 x 12 mm screws and
remove the fast idle lever.
-2. Remove the five 5 x 25 mm self-tapping
screws and remove the control housing B.
-3. Remove the two 5 x 25 mm self-tapping
screws and remove the housing cover C.
-4. Set the control lever in the throttle full open
position.
-5. Loosen the lock nut on the link joint bracket,
and adjust by turning the stopper bolt to bring
the carburetor to full open.
LINK JOINT BRACKET
-6. Tighten the lock nut. Install the housing cover
C, control housing B and the fast idle lever.
CONTROL
HOUSING B
FAST IDLE
LEVER
HOUSING COVER C
5 x 25 mm SELF-
TAPPING SCREW (2)
39
STOPPER BOLT
LOCK NUT
5 x 25 mm
SELF-
TAPPING
SCREW (5)
5 x 12 mm SCREW (2)