Meter Wire Harness B Installation (Tiller handle type only)
1) Remove the 5 x 12 mm screws and under cover.
2) Unfasten the harness band clips and remove the 40 mm cord tube.
3) Open a hole for meter wire harness as shown and route the meter wire harness A through the grommet.
4) Connect the meter wire harness A to the handle cable.
5) Reset the connectors and wires in the 40 mm cord tube and secure them with harness band clip.
6) Reinstall the under cover and secure the 5 x 12 mm screws.
5 x 12 mm SCREW
UNDER COVER
GROMMET
40 mm CORD TUBE
45
HANDLE CABLE
THROTTLE
CONTROL CABLE
SHIFT CONTROL
CABLE
METER WIRE HARNESS A
HARNESS BAND CLIP
HANDLE CABLE
METER WIRE HARNESS A
HARNESS BAND CLIP