Installation And Installation Steps - Pontos AquaCycle 3000-3 Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and installation steps

The accessories bag is situated in the switch cabinet of the system on delivery.
The key to the switch cabinet is secured by a cable tie to the mounting bracket of the switch cabinet.
Installation of the system begins with the set-up and subassembly of stage 3. Following this, stage 2
and stage 2 are set up and interconnected.
Stage 3
Stage 2
Stage 1
Note!
Remove all the transit supports
Before installation, remove the packaging material and check that the parts
supplied are complete.
Remove the transit supports of the submersible pumps (P1 and P2) in
tanks B2.2 and B1.1.
Remove the transit supports (cable ties) of the air pumps V1.1 , V1.2, V2.1
and V2.2
25012008/AV/Draft
B 2.1
B 1.1
B 1.2
Stage 1
B 3.1
B 2.1
B 1.1
B 3.1
B 3.2
B 2.2
Stage 3
Stage 2
B 3.2
B 2.2
B 1.2
13

Publicité

Table des Matières
loading

Table des Matières