Transport And Assembly - Pontos AquaCycle 3000-3 Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Transport and assembly

Delivery
The water recycling system is supplied as several groups of
components.
Note!
Please note the data in the
dimensional drawing and the
following points:
The water recycling system
must be levelled and the floor
load-bearing capacity must be
at least 1250 kg/m2.
Before positioning the water
recycling system prepare all
the connecting pipes.
Position the water recycling
system in such a way that it is
not in direct contact with
adjacent walls.
1
6x tank
(B1.1/B1.2/B2.1/B2.2/B3.1/1B3.2
)
2
1x drain pipe, pre-filter
to main drain pipe
3
1x main drain pipe
25012008/AV/Draft
4
2x collector for sediment
extraction with
electrically-operated ball
valve, T-piece and
spacing fixtures.
For connection to tank
outlets of stage 1 and
stage 2
5
1x collector for sediment
extraction with T-piece
and spacing fixtures
For connection to tank
outlets of stage 3
11

Publicité

Table des Matières
loading

Table des Matières