Route the cable with the VA2 connector to the electrically-operated ball
valve of stage 2. For this purpose use the sectioned rail on B2.2 and
cable ties from the accessories bag.
Insert the gasket (accessories bag) in the connector (VA2)..
Attach the connector to the ball valve and, using a screwdriver, tighten
the screw fastening the connector.
Photo of stages 2 and 3 installed.
3.0 Installation of stage 1
As the next step, stage 1
(B1.1 and B1.2) is preassembled and then connected to
the already installed stage 2.
B 1.1
B 1.2
Position tank B1.1 at a clearance of about 1 metre from stage 2.
Fit the electrically-operated ball valve and T-piece (7) labelled VA1 to
the main sediment extraction pipe by means of the screw coupling
(coupling nut).
22
25012008/AV/Draft