Pontos AquaCycle 3000-3 Instructions De Montage page 59

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6
1x double branch for corners
For connection of the main
drain pipe, the drain pipe from
the pre-filter and the main pipes
pre-fitted to the tanks
To 3 ( B3.1/B3.2)
7
Pre-filter mount
8
Process water piping (Mepla)
For supply of the pre-filter
backwashing device
9
Pre-filter with flex hose for filter
backwash
12
10
Accessories bag
Note!
Wear protective gloves for
transporting and installing the
water recycling system.
At least two persons are
necessary for transport of the
system.
25012008/AV/Draft

Publicité

Table des Matières
loading

Produits Connexes pour Pontos AquaCycle 3000-3

Table des Matières