Place the screw fittings on the ball valves of B1.1 and B1.2 and
tighten them by hand.
Attend to the potential equalization between B1.1 and B1.2.
Adjust the screw fittings of the T-piece of the sediment extractor so
that they are centrally aligned with the main pipes (DN100) and tighten
them by hand.
Align and centre the pipe clamp and
tighten the pipe clamp (Allen screw) using a ratchet.
Fasten the pump piping (transfer from stage 1 to 2) by the pre-fitted
pipe clamps.
24
25012008/AV/Draft