Check the space required
Mark the site of the system
Note!
Refer to the respective dimensional drawing (annexed) for the
dimensions and spaced required.
1.0 Installation of stage 3
Begin by positioning the tank B3.1.
1.2 Align the tank to the marking previously made.
Fit the sediment extractor with T-piece and spacing fixture
(5) to the frame of B3.1.
14
B 3.2
B 3.1
25012008/AV/Draft