Carefully tighten the screw fitting by hand and then
retighten it using pipe tongs.
Note!
Pay attention that the screw fitting does not
become skewed and does not damage the plastic thread
of the solenoid valve.
Then the process water pipe going to the pre-filter is secured to B1.1
by the pre-fitted pipe clamp.
Interconnect stage 2 and 1 for supply of the consumers and connect the
level sensor system of stage 1.
Pump P1.1 connection
Air pump V1.2 connection
Level electrodes (L001) connection
Route the cable with the connector VA1 to the electrically-operated ball
valve (VA1) of stage 1. For this purpose use the sectioned rail on B1.2
and cable ties from the accessories bag.
Insert the gasket (accessories bag) in the connector (VA1).
Attach the connector to the ball valve and, using a screwdriver, tighten
the screw fastening the connector.
26
25012008/AV/Draft