Start-up
Note!
For start-up, all the installation
steps according to the installation
instructions must have been
carried out.
Start-up
1. Fill stage 1 to 2 half-way with water.
2. Then check all the connections are
leakproof.
3. (After installation and start-up) prime the
booster pump according to the information
in the operating and installation instructions
of the pressure booster unit.
4. Establish the power supply by switching the
main switch.
5. After about 10 seconds, stage 3 is
automatically filled by the drinking water
top-up.
6. Check the function of all consumers
(pumps, valves etc.) in manual mode.
7. Now the running-in phase can be activated
via the display of the control unit.
Starting the running-in phase
1. Press the
button to select the Auto
menu.
2. Press the
button again to select the
Automatic Program menu.
3. Press the
button three times to call the
Running-in Phase menu item.
4. Press the
button for Running-in Phase
start. The display indicates Running-in
Phase ON.
5. Press the
button several times to quit the
menu.
300108/AV/Draft
Operating Manual AC 3000-13500
The message "SmartClean" now appears on
the display. The green LED flashes.
To conclude the start-up, check all the
functions of the water recycling system with the
switch cabinet door closed. To do so, use the
Manual
Manual Mode menu.
You will find further information on operator
control in the Control section
11