Start-up
Note!
All the installation steps must
have been carried out for start-up.
Before start-up, read the system's
Operating Manual carefully
Start-up
1. Fill stage 1 to 2 half-way with water.
2. Then check all the connections are
leakproof.
3. (After installation and start-up) prime
the booster pump according to the
information in the operating and
installation instructions of the pressure
booster unit.
4. Establish the power supply by
switching the main switch.
5. After about 10 seconds, stage 3 is
automatically filled by the drinking
water top-up.
6. Check the function of all consumers
(pumps, valves etc.) in manual mode.
7. Now the running-in phase can be
activated via the display of the control
unit.
Starting the running-in phase
Press the
button to select the Auto menu.
Press the
button again to select the
Automatic Program menu.
Press the
button three times to call the
Running-in Phase menu item.
Press the
button for Running-in Phase start.
The display indicates Running-in Phase
ON.
Press the
button several times to quit the
menu. Now the message "SmartClean"
appears on the display. The green LED
flashes.
25012008/AV/Draft
AquaCycle® 900
Note!
Start-up and system
instruction should be
attended to by
specialist staff of
Pontos GmbH.
31