Pontos AquaCycle 3000-3 Instructions De Montage page 63

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Adjust the screw fittings of the T-piece of the sediment extractor (5) so that
they are centrally aligned with the main pipes (DN100) and tighten them by
hand.
Align and centre the pipe clamp and
tighten the pipe clamp (Allen screw) using a ratchet.
Fit the process water pipe for supply (8) of the filter backwash.
Press-fit the pipe to the elbow using a Mepla pressing tool.
Tighten the provided pipe clamps for fixation.
Connect the power supply of the UV reactor. Connector and box are
labelled UV.
16
25012008/AV/Draft

Publicité

Table des Matières
loading

Produits Connexes pour Pontos AquaCycle 3000-3

Table des Matières