After each change of the float switch attachment, it is essential to perform a test
run to check that the level regulation is functioning correctly.
Attach the wall anchors for the float
switches in the upper area of the shaft,
where they are accessible from the shaft
cover (service friendly).
– Adjust the "Pump off" float switch (bot-
– The "Pump on" float switch (middle float
1
2
– The "Level high" float switch must be
3
– For additional information, refer to the as-
Änd.Index
Datum
Visum
Ersetzt durch:
TopLine 65...
Schachtinstallation BF11
Montage Anleitung
Biral AG
CH-3110 Münsingen
tom float switch) so that the parameter
S3 (see "Technical Data") is complied
with. In smaller shafts and in all situa-
tions in which overheating of the motor
can be excluded, the "Pump off"float
switch can be positioned up to 5 cm
above the suction opening of the pump.
switch) should be set so that at least
the usable volume is available between
"Pump off" and "Pump on". This means
that the pump should need a minimum
of one minute to pump away the usable
volume. When determining the usable
volume, the maximum pumps per hour
(see "Technical data") must be taken
into account and complied with.
attached slightly above the "Pump on"
float switch, so that the majority of the
reserve volume is still available when
the alarm is triggered. (Approx. 15 cm
so that it doesn't touch the medium)
sembly instructions for the level regulator
08 0515.2006.
Ersatz für:
Massstab
gezeichnet 15.03.2016
ts
1:7.5
geprüft
23.03.2016
ts
Freigabe
23.03.2016
ts
PDM_Nr
TD-0032138
Zeichnungsnummer
Änd.Index
20907608
00