SBI CAMBRIDGE II Mode D'emploi page 91

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
Instead, if the installation consisted of a horizontal vent coming out at
the back of the stove on a total distance of 4 feet, followed by a tee
and a 6-foot vertical rise, it would be acceptable. The termination is
within the allowable configuration zone on the chart since it would
have at least one foot of vertical rise for each foot of horizontal run.
Furthermore, the total vertical rise is at least 3-feet high.
WARNING: To reduce the risk of smoke spillage there should always
be at least one foot of vertical rise for each foot of horizontal run. In
all cases, at least 3 feet of vertical rise is needed.
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(83 OF 91)
83
Page 90 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières