3.5.2 Through Wall Installation (Main Floor or Basement)

TO REDUCE THE RISK OF SMOKE SPILLAGE THERE SHOULD ALWAYS BE AT LEAST 12" (30 CM) OF
VERTICAL RISE FOR EACH FOOT OF HORIZONTAL RUN. IN ALL CASES, AT LEAST 36" (91 CM) OF
VERTICAL RISE IS NEEDED BEFORE THE TERMINATION.
TERMINATION OF A SIDE WALL VENT SHOULD BE LOCATED TO AVOID PERSONAL BURN INJURY,
FIRE HAZARD AND INTERFERENCE WITH OR DAMAGE TO ADJACENT PROPERTIES. EXHAUST GASES
CAN REACH TEMPERATURES OF 500°F (260°C) AND CAUSE SERIOUS BURNS. SEE SECTION 4.4.1
PERMITTED TERMINATION LOCATION.
1. Position stove following clearances given in Section 3, Clearances to Combustible Material and
following vent manufacturer's instructions.
2. Install a stove adapter or a stove adapter tee onto the appliance flue collar.
3. Locate the position of the exhaust pipe in the wall and cut a hole of the appropriate size for vent
in the wall.
4. Install wall thimble as per vent manufacturer's instructions.
5. Ensure you install enough horizontal pipe length to exceed the exterior wall of 6 inches. Install a
tee section to the pipe passing through the wall.
6. Run the vent vertically up the wall for at least 36". Refer to the vent manufacturer's instructions
for clearances to combustible materials and installation of wall bands.
18
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(18 OF 91)
CAUTION
WARNING
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual