Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
TEST REPORT 103819589MTL-001
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103819589MTL-001
Date: 03/26/19
AIR SUPPLY SYSTEM
Combustion air enters from the rear bottom of the heater, which is directed into the firebox. All
gases exit through the 3" flue located on the back of the heater.
TEST FUEL PROPERTIES
The species of fuel used was Energex softwood pellet. Fuel moisture test was completed prior to
the certification run.
SAMPLING LOCATIONS
Particulate samples are collected from the dilution tunnel at point 20 feet from the tunnel
entrance. The tunnel has two elbows and two mixing baffles in the system ahead of the sampling
section. (See Figure 3.) The sampling section is a continuous 13-foot section of 8-inch diameter
pipe straight over its entire length. Tunnel velocity is determined by a type "S" Pitot tube located
100 inches from the beginning of the sampling section. The dry bulb thermocouple is located on
the pitot tube. Tunnel samplers are located 48 inches downstream of the Pitot tube and 36 inches
upstream from the end of this section. (See Figure 1.)
Stack gas samples are collected from the steel chimney section 8 feet ± 6 inches above the scale
platform.
Version: 05/10/17
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(6 OF 20)
Lachine, Quebec, Canada, H8T 3J1
Page 6 of 20
1829, 32nd AVenue
Telephone: (514)631-3100
Facsimile: (514)631-1133
www.intertek.com/building
GFT-OP-10c
Page 802 of 864