SBI CAMBRIDGE II Mode D'emploi page 51

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
Using a brush and an ash vacuum brush and vacuum all the dirt and ashes from the exhaust channels.
Open the hopper lid and remove the left side decorative panels (E). Unscrew the 2 screws (B).
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(43 OF 91)
43
Page 50 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières