SBI CAMBRIDGE II Mode D'emploi page 77

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
3. Open the left panel and lift it to take it out of the stove (1). Remove the exhaust collar (R) from
the flue collar (2).
4. Remove the 3 bolts that holds the exhaust motor in place and pull the exhaust motor out of the
stove.
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(69 OF 91)
69
Page 76 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières