SBI CAMBRIDGE II Mode D'emploi page 49

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
Combustion chamber: With a brush and a vacuum clean every fins of the cast iron heat exchanger (1)
and (2). Also clean the lip over the door (3).
With a brush, also clean behind the plate.
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(41 OF 91)
IT IS HIGHLY RECOMMENDED TO CLEAN THE
EXHAUST CHANNEL COMBUSTION CHAMBER
(SEE SECTION 8.1.3: EXHAUST CHANNEL AND
EXHAUST
IMMEDIATLY AFTER CLEANING THE HEAT
EXCHANGER.
NOTE
BLOWER
MAINTENANCE)
41
Page 48 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières