SBI CAMBRIDGE II Mode D'emploi page 52

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
Turn the panel (F). Slightly lift it in order to remove it.
Remove the clean out trap (H) by unscrewing both wing nuts (G). Using a brush and an ash vacuum
brush and vacuum all the dirt and ashes from the exhaust channel. Make sure that the gaskets are still
in good condition, replace them if needed.
44
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(44 OF 91)
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Page 51 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières