SBI CAMBRIDGE II Mode D'emploi page 60

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/17/2019 7:40:40 AM
1 - MANUAL ENGLISH
To validate the status of a component, you need to go to the "TROUBLESHOOT" page from the Main
Status Page. Once there you will be able to navigate with the arrows through 7 different pages.
Page 1 provides information on the software version of the stove's two electronic cards. In addition,
you have the total number of hours your stove has been in operation, the temperature of the exhaust
gases and the maximum temperature that your stove has reached.
Pages 2 and 3 will give you statistics on the number of times a specific error code has occurred.
From page 4 is the list of operating states of the electronic components. If the square is green, it
means that the operating state of the component is normal, no matter if it's on the left column or
right. If the square is red, it means that the operating condition is abnormal. This screen will give you
the operating status in real time, meaning that when the stove is running, if a state change occurs,
you will see it immediately.
WITH GREEN ICONS
WITH RED ICONS
52
Stove Builder International Inc. | 48202 | Rev: May 31 2019 10:15AM | Uncontrolled Copy
(52 OF 91)
Access to
program
VX.XX(X
VX.XX
X:XX:X
XX°F
XX°F
Pressure switch is closed. This condition is
normal if the stove is in operation.
Pressure switch is open. This condition is normal
if the stove is OFF.
Pressure switch is closed. This condition is
abnormal if the stove is OFF.
Pressure switch is open. This condition is
abnormal if the stove is in operation.
Cambridge II and Osburn 3000C Pellet Stove Installation and Operation Manual
Page 59 of 864

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI CAMBRIDGE II

Table des Matières