After a few minutes of continuous operation controlled by the room
thermostat, the adhesives and the processing residues will have
evaporated, and the following checks can be completed:
- check the gas supply pressure;
- check combustion.
CHECKING
THE
GAS
PRESSURE
- Move the main system switch to "off";
- Unscrew the fastening screws (1) on
the front panel (2).
- Pull the base of the panel (2) outwards
and then upwards to release it from
the frame and then remove it.
- Unscrew the screw on the pressure
test point (3), located upstream of
the gas valve, around two turns, and
connect a pressure gauge.
- Power-up the boiler by moving the main system
switch and the main switch/switches on the applian-
ce to "on".
42
SUPPLY
2
Après quelques minutes de fonctionnement continu, obtenu par
une demande du thermostat d'ambiance, les liants et les résidus
d'usinage se sont évaporés et on peut effectuer :
- le contrôle de la pression du gaz d'alimentation ;
- le contrôle de la combustion.
1
- Alimentar electricamente o grupo térmico pondo o
interruptor geral do equipamento e o(s) principal(ais)
do aparelho em "aceso".
FRANÇAIS
CONTRÔLE DE LA PRESSION DU
GAZ D'ALIMENTATION
- Mettre l'interrupteur général de l'in-
stallation sur « arrêt » ;
- Dévisser les vis (1) de fixation du
panneau frontal (2).
- Tirer vers soi puis vers le haut la
base du panneau (2) pour décrocher
ce dernier du châssis et le retirer.
- Dévisser d'environ deux tours la vis
de la prise de pression (3), en amont
de la vanne gaz, et y brancher un
manomètre.