Electrical connections

The POWER PLUS 50 M, 50 M DEP, 100 M and 100 M DEP boilers
leave the factory completely wired, with the power cable already
connected, and only require the connection of the room thermo-
stats, the outside probe and the pumps used, to the corresponding
terminals. Only the Bus cable and the pump need to be connected,
see the wiring diagram.
To do this:
- Move the main system switch to "off";
- Unscrew the fastening screws (1) on the front
panel (2);
- Pull the base of the panel (2) outwards and
then upwards to release it from the frame and
then remove it;
- Turn the control panel (3) and remo-
ve the rear cover, taking out the
locking screws (4).
- Identify the terminal block (5) and
make the connections, as in the dia-
gram shown below.
34
Raccordements électriques
Les chaudières POWER PLUS 50 M, 50 M DEP, 100 M et 100 M
DEP quittent l'usine entièrement câblés, avec le câble d'alimenta-
tion électrique déjà raccordé, et ne nécessitent que le raccordement
des thermostats d'ambiance, de la sonde extérieure et des circula-
teurs utilisés, à effectuer sur les bornes dédiées.
2
1
Pour ce faire :
- Mettre l'interrupteur général de l'installation sur
« arrêt ».
- Dévisser les vis (1) de fixation du panneau frontal
(2).
- Tirer vers soi puis vers le haut la base du pan-
neau (2) pour décrocher ce dernier du châssis
et le retirer.
- Tourner le tableau de commande (3)
et retirer le panneau arrière en enle-
vant les vis de fixation (4).
- Identifier le bornier (5) et effectuer les
raccordements comme indiqué sur le
schéma ci-dessous.
FRANÇAIS
FR

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Power plus 50 m depPower plus 100 mPower plus 100 m depPower plus 100 sPower plus 100 s dep

Table des Matières