Cooling possible:
Min. cooling target flow temp.:
DHW
Circulation pump
Anti-legio. day:
Anti-legio. time:
Cylinder charging hysteresis:
Max. cyl. charging time:
Cyl. charg. anti-cycl. time:
Screed drying profile
E.12
Menu item: Screed drying
MENU | SETTINGS | Installer level
Screed drying, day (can only be selected if no system control is
installed)
E.13
Menu item: Reset
MENU | SETTINGS | Installer level
Reset
Reset statistics
Reset maintenance message
Reset high-pressure switch
8000017440_FT Installation and maintenance instructions
Yes
No
Factory setting: No
The system control regulates the heating circuit to the min. cooling
target flow temperature: °C. Prerequisite: The Cooling possible:
function has been activated.
Define the days on which you want the anti-legionella function to
run. On these days, the water temperature is increased to above
60 °C. The circulation pump is activated. The function ends after
120 minutes at the latest. If the "Absence" function is activated,
the anti-legionella function is not carried out. As soon as the "Ab-
sence" function ends, the anti-legionella function is carried out.
Heating installations with heat pumps use the back-up boiler for
the anti-legionella function.m
Off, Monday, Tuesday, Wednesday, Thursday, Friday, Sat-
urday, Sunday
Factory setting: Off
Define the time at which you want the anti-legionella function to
run.
Factory setting: 04:00
The cylinder charging starts as soon as the cylinder temperature is
lower than the desired temperature minus the hysteresis value.
Factory setting: 5 K
Setting the maximum time at which the domestic hot water cylin-
der can be charged without interruption. If the maximum time or
the target temperature is reached, the system control enables the
heating function. The 15 minutes setting means that the cylinder
charging time is not restricted.
Factory setting: 60 minutes
Setting the time period during which the cylinder charging is
blocked after the maximum cylinder charging time has elapsed.
During the blocked time, the system control enables the heating
function.
Factory setting: 60 minutes
Setting target flow temperature for day 1–29 in accordance with
the construction regulations.
0–90 °C
Activates screed drying for freshly laid screed in accordance with
the settings under the screed drying profile. Setting the start day
and temperature
Screed dry., day:, Screed dry., temp.: °C
Yes, No
Yes, No
Yes, No
253