1 CDI unit
2 Hot starter cable
3 Throttle cable (return)
4 Throttle cable (pull)
5 Cable guide
6 Ignition coil
7 Radiator hose 2
8 Radiator breather hose
9 Radiator hose 4
0 CDI unit bracket
A CDI unit band
A
CABLE ROUTING DIAGRAM
Å Pass the hot starter cable and
throttle cables through the
cable guides.
ı Pass the hot starter cable and
throttle cables between the
radiator and frame, then under
the radiator mounting boss.
Ç Pass the throttle cables on the
outside of the ignition coil.
Î Pass the radiator breather
hose in front of the radiator
hose 2, on the left of the chas-
sis, and then between the
frame and radiator hose 4.
‰ Insert the CDI unit band over
the CDI unit bracket as far as
possible.
7
8
Î
9
2 - 20
SPEC
Ï First install the CDI unit and
CDI unit band to the CDI unit
bracket, then the CDI unit
bracket to the frame.
Ï
1
A
B
1
A
B
Ç
6
‰
0
2
3
4
5
Å
ı