4
1
3
4. Check:
• Rod end movement
Rod end free play exists → Replace the rod
end.
Rod end turns roughly → Replace the rod
end.
5. Inspect:
• Right relay arm 1
2
• Left relay arm 2
• Idler arm 3
Cracks/damage → Replace.
• Bearings 4
Wear/damage → Replace.
INSTALLATION
1. Install:
• Relay arms 1
• Bushings
• Washers 2
• Clips 3
2. Install:
• Idler arm 1
• Bushings
• Washers
• Relay rod 2
• Cotter pins
CAUTION:
Always use new cotter pins.
NOTE:
Install the idler arm with the "R" mark a on the right
side facing towards the rear of the machine.
53
CHAS
STEERING
Relay arm bolt:
53 Nm (5.3 m · kg, 38 ft · lb)
Idler arm nut:
35 Nm (3.5 m · kg, 25 ft · lb)
Relay rod-idler arm nut:
30 Nm (3.0 m · kg, 22 ft · lb)